$ 208.98
These Dachshund Earrings are an original Esquivel and Fees jewlery design.
Our Dachshund Earrings weigh approximately 3.9 grams This design measures approximately 3/16 inch high (4.8 mm) .Your hand made Dachshund Earrings will arrive in an attractive gift box and carry our 30 day satisfaction guarantee.Our handmade Dachshund Earrings are perfectly detailed. We offer hypoallergenic surgical steel post backs, French ear wires and leverback ear wires. If you require a special earring type, please contact us. These Dachshund Earrings are 14K Gold Vermeil Optional genuine stone accents and custom engraving are available on most of our designs. Please ontact us for prices.
All of our work is available in sterling silver, 14k yellow gold, 14k white gold, 14k rose gold, 18k yellow gold and 14k gold vermeil. If you are interested in any of these metals, please contact us.All of our Long Hair Dachshund jewelry and our Dachshund jewelry is proudly made in the U.S.A.
This Dachshund jewelry design is copyright 2025 by Esquivel and Fees. All Rights Reserved. LHD1H-EVM