Pomeranian Earrings 14k Gold Vermeil Handmade Pomeranian Jewelry PM24H-EVM

Esquivel and Fees

These Pomeranian Earrings are an original Esquivel and Fees jewlery design.

Our Pomeranian Earrings weigh approximately 4.6 grams This design measures approximately 3/8 inch high (9.5 mm) .Your hand made Pomeranian Earrings will arrive in an attractive gift box and carry our 30 day satisfaction guarantee.Our handmade Pomeranian Earrings are perfectly detailed. We offer hypoallergenic surgical steel post backs, French ear wires and leverback ear wires. If you require a special earring type, please contact us. These Pomeranian Earrings are 14K Gold Vermeil Optional genuine stone accents and custom engraving are available on most of our designs. Please ontact us for prices.

All of our work is available in sterling silver, 14k yellow gold, 14k white gold, 14k rose gold, 18k yellow gold and 14k gold vermeil. If you are interested in any of these metals, please contact us.All of our Pomeranian jewelry and our Pomeranian jewelry is proudly made in the U.S.A.

This Pomeranian jewelry design is copyright 2025 by Esquivel and Fees. All Rights Reserved. PM24H-EVM


Category: Earrings



Next Previous

Related Items